A site located in Lithgow. The geotechnical report was submitted 3 days after completion of fieldwork. Our geotechnical report on this complicated site was accepted by the local council.
The report covered the following contents:
TABLE OF CONTENTS
1. INTRODUCTION
1.1 Available Information
1.2 Proposed Development
1.3 Scope of Work
2. SITE DESCRIPTION
3. LOCAL GEOLOGY
4. METHODOLOGY OF INVESTIGATION
4.1 Pre-fieldwork
4.2 Borehole Drilling
4.3 Dynamic Cone Penetrometer (DCP) Test
4.4 Geological Mapping
5. INVESTIGATION RESULTS
5.1 Surface Conditions
5.2 Subsurface Conditions
5.3 Groundwater
6. GEOTECHNICAL ASSESSMENT
6.1 Site Classifications
6.2 Excavation Conditions
6.3 Excavation Support / Stability of Excavation/Filling
6.4 Earth Retaining Structures
6.5 Foundations
6.6 Comments on Earthworks and Material Reuse
6.7 Preliminary Comments on Pavement Subgrade
6.8 Landslide Risk Assessment and Mitigations
6.8.2 Predevelopment
6.8.3 Post-Development
6.8.4 Mitigation and Control Measures
7. CONCLUSIONS AND RECOMMENDATIONS
8. LIMITATIONS
|
|