| |

ESWNMAN - Geotechnical Engineering Consultants

Search
View: 1101 | Reply: 0
Print Prev. thread Next thread

Borehole drilling up to 4m in Botany Sand at Monterey

[Copy link]

66

Threads

0

Friends

0

Money

Jump to specified page
#1
Post time: 2018-09-10 15:43:52
|Show the author posts only |Descending
ESWNMAN staff completed a borehole to 4.0m deep wihtin Botany SAND using a hand operated equipment. The purpose of investigation is to define the groundwater table for a residential development with one level of basement. Groundwater table is critical for the design and construction cost.

We completed two boreholes successfully in one day and obtained adequate information for a geotechncial assessment report.

IMG_1608.JPG




Reply

Use magic Report

Contact Us| info@eswnman.com.au| ESWNMAN Pty Ltd (ABN 70 603 089 630)

2019-09-21 03:57 GMT+8 , Processed in 0.049970 sec., 22 queries .

Powered by ESWNMAN Pty Ltd!

To Top